Skip to content
SRD Corp

IT Infrastructure & Managed Services

Cloud & FinOps

Most GCCs are cloud-first but must align with HQ's architecture, security and budget. We set up compliant landing zones, migrate workloads and keep cloud spend visible and under control.

What's included

How we help

Cloud subscriptions

Hyperscaler subscriptions and marketplace purchases with consolidated billing in India.

Landing zones

Account structure, identity, networking and guardrails aligned to your global standards.

Migration

Assessment, wave planning and migration of workloads from data centre to cloud.

FinOps & cost optimisation

Tagging, budgets, rightsizing, reserved capacity and monthly cost reviews.

Managed cloud

24x7 monitoring, patching, backup and security operations for cloud workloads.

Cloud bills grow through neglect, not through usage

The spend that surprises people is rarely the workload they meant to run. It is the environment nobody turned off, the oversized instance chosen during testing and never revisited, storage snapshots accumulating indefinitely, and data egress nobody modelled.

These are not sophisticated optimisation problems. They are housekeeping, and they persist because no individual has the job of looking. Tagging that identifies an owner for every resource is the control that makes the rest possible, and it only works if it is enforced at creation rather than tidied up afterwards.

Most centres find meaningful savings in the first review simply by switching off what nobody needs. The harder part is the arrangement that stops it recurring.

Commitment discounts need a baseline you believe

Reserved capacity and savings plans reduce unit cost substantially in exchange for commitment. They are a good deal when the baseline is genuinely steady and an expensive one when it is not, because the commitment outlives the workload it was bought for.

The sound approach is to commit to the floor rather than the forecast: the portion of consumption you are confident persists, with the variable part left on demand. Committing to the forecast means paying for growth that may not arrive.

For a new centre, that floor is usually small for the first year and should be revisited as the pattern becomes real, rather than set once at the start.

Decide what stays on premise before you lift and shift

Moving workloads to cloud unchanged reproduces the existing architecture at a different cost base, and frequently a higher one, because an architecture designed for owned hardware does not take advantage of elasticity. The saving comes from changing how something runs, not from where it runs.

Some things are also better left where they are. Steady predictable workloads with no elasticity requirement often cost less on owned equipment, and data residency or latency requirements can settle the question regardless of cost.

The useful exercise is workload by workload rather than a single policy, and it is worth doing before migration rather than as a remediation afterwards.

Planning a GCC in India?

Talk to us about your timelines, headcount and technology needs. We'll come back with a clear plan and a single point of contact.